Production log

Here is our production log of what we planned to do for our thriller opening.

22/11/15 - Idea and concept were brainstormed and  the script writing began.

29/11/15 - Final script was completed and filming was to begin the next day.

30/11/15 - The 3 possible filming locations for the first scene were assessed. For the first location it was decided that the lack of equipment made it difficult to use. The second location (small gym) was currently being occupied and so we resorted to the third location (drama studio). We managed to film in the third location (sixth form study room) but the lighting was poor and filming was postponed until the other locations were assessed and approved for filming.

09/12/15 - The third location, once again was being occupied and filming was postponed until the next day which was when it would be available.

10/12/15 - Location test in the drama studio was done to see if the lighting and sound were suitable. The results came out favorable and so the actual filming would be done on 14/12/15.

14/12/15 - All filming was done in the drama studio. The resulting footage came out well but more filming was to be done if the full opening was to be finished and editing would begin.

05/01/16 - Editing in the media suite began and the opening began to come out as we would have liked. 

06/01/16 - Editing continued but footage fell short of expectations and more filming in multiple other locations was scheduled for the next two weeks.

11/01/16 - The title music was created for the opening ahead of the extra filming. 